After stress relief annealing, the core is cut, and then the transformer core is assembled by tying steel around the copper (or aluminum) current-carrying coil. In stress-relieved annealing conditi...
DESCRIPTION
After stress relief annealing, the core is cut, and then the transformer core is assembled by tying steel around the copper (or aluminum) current-carrying coil. In stress-relieved annealing conditions, grain-oriented steels are sensitive to mechanical strain
Origin
|
China
|
|||
Packing
|
Export standard package (as per requirements)
|
|||
Payment Terms
|
30% T/T in advance as deposit,70% balance against the B/L copy or 100% irrevocable L/C at sight
|
|||
MOQ
|
3 tons per size
|
|||
Delivery time
|
15-40 days after receiving L/C or deposit
|
|||
Loading Port
|
Shanghai , China (any port in China )
|
|||
Remark
|
Specific requirement of alloy grade,temper or specification can be discussed at your request
|
FAQ
1.Q: Can you provide sample?
A: Yes, for regular sizes sample is free but buyer need to pay freight cost.
2.Q:How can I get a quotation from you ?
A:You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager. And you can also find our contact information on contact page.
3.Q: Can provide OEM/ODM service?
A: Yes. Please feel free to contact us for more details discuss.
Our Email: info@gescosteel.com.